Fan Air-changes Data

Views :
Update time : 2026-10-12

Air Changes

Air Changes per hour

The air changes up to eight an hour provide for removing contamination normally caused by human occupants. The higher rates of air changes provide for removing heat and steam in temperate zones. In hot climates the air changes per hour should be at least doubled.

Where smoking occurs allow twice the number of air changes.

The Table below gives a guide to the number of air changes per hour generally accepted in ventilation.

Space / ApplicationRecommended ACH RangeNotes & Design Criteria
Assembly & Public Spaces

Assembly Halls4 – 6—
Auditoriums4 – 6High occupancy; adjust for events
Banquet / Function Halls6 – 10High heat & odour; peak occupancy
Churches / Chapels0.5 – 1—
Cinemas / Theatres10 – 15Include stage & backstage ventilation
Club Rooms / Lounges8 – 10—
Concert Halls4 – 6Supplemental cooling for high occupancy
Dance Halls6 – 8—
Exhibition / Showrooms4 – 8Higher during peak visitor periods
Galleries / Museums2 – 4Humidity & temperature control critical
Libraries / Reading Rooms2 – 4Low odour; preserve materials
Lobbies / Entrance Halls4 – 6Air curtain assistance recommended
Meeting / Conference Rooms6 – 10Higher during full occupancy
Museums2 – 4Strict humidity control
Stadiums / Sports Arenas4 – 8Localised extraction for active zones
Food & Beverage

Bakeries20 – 30High heat & moisture; dedicated extraction
Cafés & Coffee Bars10 – 12—
Canteens4 – 6—
Commercial Kitchens15 – 20Canopy extraction essential
Domestic Kitchens10 – 15Min. 15 ACH during active cooking
Fast Food Outlets12 – 16High heat, grease & odour
Food Processing Areas15 – 30Hygiene standards apply; varies by process
Restaurants8 – 12Increased from original 6–10; heat & odour
Takeaway Food Shops10 – 15Grease filters required on extraction
Commercial & Office

Banks2 – 4—
Conference / Meeting Rooms6 – 10—
Data / Server Rooms15 – 30Temperature control critical; redundant systems
Offices — General4 – 6—
Offices — Open Plan / Dense6 – 8Higher occupancy density
Offices — Private / Executive3 – 5—
Post Rooms / Mail Sorting6 – 10Dust control
Reception Areas4 – 6—
Retail Shops — General4 – 8Higher for crowded locations
Retail — Cosmetics / Perfume8 – 12Strong odour control
Retail — Grocery / Supermarket6 – 10Produce section higher humidity
Warehouses — Storage2 – 4—
Warehouses — Active / Packing4 – 8—
Healthcare & Care

Clinics — General4 – 6—
Dental Surgeries6 – 10Aerosol control; local extraction
Hospitals — General Wards4 – 6Operating Theatres: 15 – 25 ACH
Hospitals — Isolation Rooms6 – 12Negative pressure required
Laboratories — General6 – 12Higher with fume hoods in use
Laboratories — Biological / Containment12 – 25Pressure cascade; HEPA filtration
Nursing Homes / Rest Homes3 – 5—
Pharmacies4 – 6—
Treatment / Examination Rooms6 – 10—
Education & Childcare

Classrooms — Schools3 – 4Updated from original 2–3; ASHRAE 62.1
Computer Labs6 – 10Equipment heat load
Daycare / Early Learning Centres4 – 6Higher fresh air requirement per child
Gymnasiums / Sports Halls6 – 12High activity levels = higher ventilation
Laboratories — Schools6 – 10Fume extraction as required
Lecture Theatres4 – 8—
Staff Rooms6 – 8—
Accommodation

Bedrooms — Hotels / Motels2 – 4—
Bedrooms — Residential1 – 2—
Ensuites / Bathrooms (Enclosed)10 – 20Continuous: 10–15 ACH; Peak: 15–20 ACH
Hallways / Corridors — Accommodation3 – 5—
Hotel Bars8 – 12Increased from original 4–6; odour & occupancy
Hotel Lobbies4 – 6—
Kitchenettes — Guest Units8 – 12—
Living Rooms — Residential2 – 3—
Residences — General Background0.35 – 0.5NZ Building Code minimum; 1–2 ACH includes infiltration
Toilets / Bathrooms — Shared8 – 12—
Industrial, Workshop & Utility

Boiler Houses20 – 30Heat & fume extraction
Compressor Rooms15 – 25High heat load
Control Rooms6 – 12Dust & temperature control
Dye Works20 – 30Chemical fumes; EX-rated motors where required
Dyno Rooms30 – 60Engine heat, exhaust & fuel vapour; negative pressure; EX-rated extraction motors mandatory if flammable vapours present
Engine Rooms20 – 30—
Factories — Light Assembly6 – 10—
Factories — Heavy Processing10 – 20Process-specific requirements apply
Foundries20 – 30High heat & dust; local extraction
Garages — Private / Residential4 – 6—
Garages — Commercial / Public6 – 10CO monitoring recommended
Garages — Underground / Enclosed10 – 20Mechanical extraction mandatory; sensor interlock
Generator Rooms20 – 40High heat & exhaust; EX-rated motors
Heat Treatment Rooms15 – 30—
Machine Shops6 – 10Oil mist extraction recommended
Paint Booths — Water-based / Touch-up15 – 25EX-rated exhaust motor required; face velocity 0.3–0.4 m/s; IP55+
Paint Booths — Solvent-based20 – 40EX-rated exhaust motor required; face velocity 0.4–0.5 m/s; flameproof enclosure
Paint Booths — High-VOC / Fast-drying40 – 60EX-rated exhaust motor required — Zone 1/2 certified; face velocity 0.5–0.7 m/s; spark-resistant construction
Paint Booths — Powder Coating15 – 25EX-rated exhaust motor required; dust ignition-proof; ATEX/IECEx compliant
Printing Rooms10 – 20Solvent vapour control
Storage — Chemical / Flammable15 – 30EX-rated motors mandatory; pressure relief; vapour extraction
Tool Rooms4 – 6—
Welding Bays / Areas15 – 30Local fume extraction essential; EX-rated where applicable
Specialised & Recreational

Billiard / Pool Rooms6 – 8—
Bowling Alleys6 – 10—
Darkrooms — Photographic10 – 15Chemical fume extraction
Laundries — Commercial / Institutional20 – 30High heat & moisture
Saunas / Steam Rooms10 – 20Moisture removal; timed overrun
Swimming Baths / Natatoriums20 – 30Separate dehumidification system required
Agricultural & Animal Housing

Calf / Piglet Housing6 – 10—
Dairy / Milking Parlours10 – 20Hygiene & odour control
Pig Houses6 – 10—
Poultry Houses6 – 10—
Shearing Sheds6 – 12Dust & fibre extraction
Stables / Horse Barns6 – 10Dust & ammonia control
Sanitation & Service

Change / Locker Rooms6 – 10Moisture & odour control
Lavatories / Public Toilets10 – 15—
Showers — Communal15 – 25High moisture; timed overrun recommended
Waste / Refuse Rooms10 – 20Odour control; negative pressure; sealed extraction



AIRFLOW CALCULATION — Quick Reference & Samples

Basic Formula

Q = Room Volume × ACH
Volume = L × W × H
Add +20% for duct/filter losses → Fan selection

Sample 1 — Office

  • Size: 8m × 6m × 2.8m = 134.4 m³

  • ACH: 5

  • Q = 134.4 × 5 = 672 m³/h

  • Fan = 672 × 1.2 = 806 m³/h ✅

Sample 2 — Commercial Kitchen

  • Size: 6m × 4m × 3.2m = 76.8 m³

  • ACH: 20

  • Q = 76.8 × 20 = 1,536 m³/h

  • Fan = 1,536 × 1.25 = 1,920 m³/h ✅

Sample 3 — Paint Booth (EX Motor)

  • Size: 5m × 3.5m × 2.8m = 49 m³

  • ACH: 35 → Q = 1,715 m³/h

  • Face velocity governs: 0.45 m/s → ~15,900 m³/h

  • Fan = 15,900 × 1.2 = 19,080 m³/h

  • ✅ EX-rated motor mandatory — ATEX/AS/NZS compliant

Sample 4 — Dyno Room

  • Size: 7.5m × 5m × 4m = 150 m³

  • ACH: 50

  • Q = 150 × 50 = 7,500 m³/h

  • Fan = 7,500 × 1.2 = 9,000 m³/h

  • ✅ EX-rated motor if flammable vapours present


Related News
Read More >>
Welcome to Our new site 2026 Welcome to Our new site 2026
10 .12.2026
Welcome to Our new sitewill finish update by 10/4/2016Hope this new site will he
MingFans Air — Return & Wa MingFans Air — Return & Wa
10 .12.2026
MingFans Air — Return & Warranty PolicyReturnsStandard / In-Stock ProductsChange
Customer Service Customer Service
10 .12.2026
 CUSTOMER SERVICE is of the most importance to MingFans Air Limited and we prid
Fan Air-changes Data Fan Air-changes Data
10 .12.2026
Air ChangesAir Changes per hourThe air changes up to eight an hour provide for r

Leave Your Message